Font Size: a A A

The Construction Organization Design Of Chengdu To Dujiangyan Railway Pengzhou Branch Line

Posted on:2014-02-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y H MengFull Text:PDF
GTID:2232330398975206Subject:Project management
Abstract/Summary:PDF Full Text Request
Construction organization design is robust guide and organize the construction of a comprehensive technical and economic basis of the enterprise managers organize the construction is superior check on the progress of the project, the basis of the nuclear production control institutions at all levels organize the construction of a strong guiding reduce the project cost, to ensure project quality, rational organization of the duration of the project, the basis of the material supply plan.Construction organization design must be based on objective reality and conditions, overall planning, scientific plans for the preparation of the best programs, and strive done a state-of-the-art, scientific, reasonable, in line with the actual.Combined with the real situation, to follow the principles of the construction contract. Strictly in accordance with the construction contract duration, quality, safety and target preparation of construction organization design to ensure that the requirements of the contract have been effectively guaranteed. In the preparation of the construction organization design, carefully read the check for the technical design documents, the design intent, and grasp the situation, strictly in accordance with the preparation of design data and design principles applied to the group, to meet the design standards and requirements. In strict accordance with the standards of the country, industry, according to railway construction safety procedures, system, management, programs, and resources to develop practical measures to ensure construction safety, obey the instructions of the construction unit to accept the guidance of the advisory unit, subject to the supervision engineer supervision and inspection, serious security discipline, act in strict accordance with procedures to ensure construction safety. In order to ensure the quality, safety, environmental system in the effective running of the project, the scientific establishment of staffing, the use of passenger railway’s successful experience and advanced technology, with a lean and efficient technical backbone of professional construction team, give full play to the role of the backbone of the technical staff.
Keywords/Search Tags:construction organization design, safety, quality, schedule
PDF Full Text Request
Related items