Font Size: a A A

Weifang Economic Development Zone The Experimental Secondary School Project Quality Management Research

Posted on:2013-08-30Degree:MasterType:Thesis
Country:ChinaCandidate:H N ZhangFull Text:PDF
GTID:2247330377452238Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of our national economy and society, the number andsize of the project is also increasing. Especially in recent years, China’s constructionindustry has been rapid development, the various types of construction projects continueto emerge. Construction quality problems also caused a lot of attention, many of theproject there are a large number of defects, and left a lot of hidden dangers for the safetyof people. School buildings project engineering quality problems reported repeatedlymade public. How to improve and ensure the quality of construction has now become thepeople most concerned about building academic research focus. The most importantenvironmental management of the project is to build quality control, it is mainly by virtueof some of the specific Project Quality Management principles and methods to achieve.The so-called construction project quality management is to project the object of study,within the provisions of the plan in the progress of the project to achieve the constructionobjectives and requirements, and achieve the best architectural effect; preparation ofproject plans, project management and control of the whole quality management, theprocess of the comprehensive plan, organize and coordinate construction projects toensure that construction projects within the scope of the request to be completed inaccordance with quality standards. In this paper, Wei fang Economic Development Zone,the experimental secondary school project and its quality management, analysis, andcomprehensive construction of the project quality management system and operationalmechanism in construction in the project implementation process and improve thesafeguards for the Wei fang Economic Development Zone The experimental secondaryschool construction projects and to provide a theoretical support and management.The full text include the following four parts:The first part of Wei fang open experimental secondary school project qualitymanagement. Include three points: First, the school building project overview, includingthe basic content and objectives of the project construction, the size of the projectobjectives, the duration of the project objectives, project participants relationship; Schoolproject participants to quality management, including project A party Quality Management,Project B quality management and other stakeholders of the project quality managementanalysis; is a special campus project quality management, including the multiplicity of the project quality objectives and project quality, the diversity of behavior analysis.The second part, Wei fang Economic Development Zone, the experimental secondaryschool project quality management system to build. Include the following three points, thegeneral idea of First Project Quality Management System, including the guiding ideology,the principle of quality management system project build; ISO9000and TQM in projectquality management, including the quality of the ISO9000quality management system inthe project management, quality management, project quality management system; projectquality management system framework, including project quality management systemframework design, project quality management system composition.The third part, Wei fang Economic Development Zone, the experimental secondaryschool project quality management system operation mechanism. Four-point mechanismfor building framework of the school building project quality management system, themechanism of the responsibilities of the project quality management system, qualityinformation management system, quality acceptance, and audit mechanisms.The fourth part, Wei fang experimental secondary school project set up through theopen area of project quality management system to improve and safeguard measures.Including the safeguards implemented by the improvement of project quality managementsystem and key, and project quality management system, operating results in two parts.Experimental secondary school project in Wei fang Economic Development Zone,the construction of the quality management system and successfully applied toconstruction enterprises, market competitiveness, the quality level of the enterprise projectmanagement capabilities. Construction enterprises, the quality management system of theexperimental secondary school project is not only the needs of the project itself, but alsothe survival of the enterprise market and development needs.
Keywords/Search Tags:Experimental Middle School in Wei fang Economic DevelopmentZone, School Projects, Project Management, Quality Management
PDF Full Text Request
Related items