Font Size: a A A

Research On Titanium Dioxide Waste Mention Scandium Semi-industrial Tests Project Integration Management

Posted on:2014-07-28Degree:MasterType:Thesis
Country:ChinaCandidate:Z Q YangFull Text:PDF
GTID:2251330401986584Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In this paper, take the Titanium Dioxide Waste mention scandium semi-industrial pilot projects for example, an attempt to explore and research on the theoretical knowledge of project integration management.The knowledge of stakeholder expectations management, project cost control management and project communication management is utilized to analysis the issues related to the project. The solution are also described in detail.In this paper, the research ideas is:First of all, the background and significance of the topics discussed, the methods and ideas of research is illustrated. We also briefly introduced the basic situation of The Titanium Dioxide Waste mention scandium semi-industrial pilot projects.Secondly, Literature Review. We described the inspection of project management, project integration management narrativ. Summarized the research of project integration management development at home and abroad.Once more, We described Titanium Dioxide Waste mention scandium semi-industrial pilot projects. From every single connetion,described project planning, start, project implementation and monitoring, as well as various aspects of the content of the end of the project, spread out list of related data tables,make the instance full and rich, prepare to the subsequent analysis and discussion of the solution with good material.Finally, We described the problems Titanium Dioxide Waste mention scandium semi-industrial pilot project integration management and put forward countermeasures. By analyzing the project instance, explored and researched the project cost control management, project stakeholder expectations management, project communication management, etc., put forward the the solve method and recommended, proposed solutions of the advantages, disadvantages conduct analysis and discussion. Provide some reference for the construction of such projects in the future.In the Final section, summarized the results of this paper and identify its shortcomings. Propose further research directions for the future.
Keywords/Search Tags:Project, Semi-industrial, Project integration management, Rare earth
PDF Full Text Request
Related items