Font Size: a A A

Research On The Mid-term Evaluation And Countermeasures For Economic Benefits Of Sanre Company’s Heat Source Project

Posted on:2013-07-05Degree:MasterType:Thesis
Country:ChinaCandidate:Y CongFull Text:PDF
GTID:2252330401961402Subject:Business administration
Abstract/Summary:PDF Full Text Request
Shenyang City, the third thermal heating company Taiyuan street district heating project, referred to as the heat source project. It is the use of Japanese government loan, in order to improve the air pollution in Shenyang city of Shenyang for the purpose of environmental protection planning of key projects.Correct evaluation of the economic benefits in the heat source projects run state, the heat source projects continue to improve and new project feasibility and conduct will provide more valuable reference.Yen loan project loan repayment period is longer,30-40years, along with the rapid development of China’s economic and industrial structure change and the environment and conditions for foreign investment in China have changed dramatically, arising from the projectthe reality of data between economic efficiency differences not only reflected in the feasibility analysis of data parameters and operation of the project. How to fully achieve the expected goals of the use of foreign loans, to ensure that the project’s expected economic benefits reached, the economic benefits of the project mid-term evaluation of its practical significance.Firstly the operating characteristics of the heat source projects combined in the study based on the theory of project evaluation, to select effective method for the evaluation of the economic benefits for the heat source project, followed by the establishment of economic benefit evaluation index system for heat source project based on the heat source projectsdeviation calculation and comparison of the target, the head of operations during the actual state of the economic benefits and project analysis and find the deviation of the internal and external causes and influencing factors proposed heat source project should the operators merge as soon as possible, to raise the level of managementand reduce the financial risk and recommendations for improvements and countermeasures. This paper is divided into five parts are discussed.The introduction part, in the domestic and international project evaluation is based on the study, the thesis puts forward the research methods and content.In the first chapter, the project economic evaluation theory based on, to the economic benefits of the project evaluation methods were selected to establish the heat source, economic benefits of project evaluation system.In the second chapter, using comparative analysis method, according to the financial evaluation of the original data and parameters, the heat source of the economic benefit of project profitability, solvency and ability to resist risk indicators for mid-term evaluation.In the third chapter, analysis of source of project economic benefits index, and analyses the reasons for the deviation from expected and the influencing factors.In the fourth chapter, proposed for the realization of the use of yen loans to determine the expected economic benefits, the heat source project in the process of operation in future should adopt countermeasures and suggestions.
Keywords/Search Tags:Project, Benefit evaluation, Index system, Countermeasure
PDF Full Text Request
Related items