Font Size: a A A

Tianjin Passenger Cruise Terminal Building GRC Fabrication And Installation Engineering Quality Management

Posted on:2014-10-27Degree:MasterType:Thesis
Country:ChinaCandidate:Z Y ZhangFull Text:PDF
GTID:2252330425465375Subject:Industrial Engineering
Abstract/Summary:PDF Full Text Request
Construction project is one-time of, temporary of figures, needs inputs large resources,including artificial, and material, and energy and funds, its quality directly relates to productsof security and applicability, relates to people life property of security and social of settled,also directly relates to building construction enterprise of survival and development, so doquality management is very important of, research how strengthened quality managementalso has very important of of relevance.Tianjin Port cruise terminal passenger building engineering outside eaves decorativecurtain wall and roofing part large used GRC (Glass-fiber Reinforced Cement)(glass fiberenhanced cement) material, this material plasticity strong, completed curve styling ofperformance has not alternative of advantage, but the material in cruise terminal projectShang of using number of more, styling of complex is zhiqian building are no encountered of,so GRC produced and installed engineering has is big of challenging, Also worthsummarizing and drawing author as the main project of the Tianjin Port international cruiseterminal Manager, after successful completion of the stated objectives of the works,summarize the project’s experience, in particular GRC fabrication and erection works, hopefor similar projects to reference and reference.First, this paper analyses the history of construction engineering quality managementand related theories, and briefly introduces the basic theory of total quality management, andidentifies the basic theory of total quality management is the study of GRC fabrication anderection works of theoretical basis, elaborates on GRC after manufacture and installation ofquality planning process and points, on how we can improve GRC fabrication andinstallation quality management conducted preliminary research. Then put forward theconcept of quality assurance, and system settings for the establishment, organization andquality control responsibility system to standardize the construction of detailed programme;and finally focused on different management phase (before, during and after) as well asvarious management factors (that is, people, materials, equipment, methods, andenvironmental) to study the GRC manufacture and installation of quality control. Andcombined with engineering example application of target management method, try the usefulidea of quality management, project actual situation of building a construction unit quality assurance organization, developed a detailed quality prevention measures and policyresponses, by setting up quality control, process quality control to implement project qualitymanagement.Finally this paper discusses the complementary relationship between the supervisionmanagement of construction enterprises, also separately managed in accordance with before,during and after phase, elaborated the project supervision work should be completed by theDepartment, the special is to be noted that, a successful project is a systematic project, andproject supervision bodies should be fully aware of this point, need to give full play to thesystem administrators role.Tianjin cruise terminal passenger building engineering by construction, andconstruction units, and design units and supervision units close tie, active played respectiveof management duties and management advantage, eventually made successfully success,was Zhan tianyou award, and national quality award, multiple awards, especially whichGRC related part more is engineering of highlights, thereafter construction units also soproject of success obtained has is big of proceeds, including social benefits and statistics.
Keywords/Search Tags:Tianjin Port international cruise terminal, GRC fabrication and installation qualitycontrol the quality control of supervision management
PDF Full Text Request
Related items