Font Size: a A A

The Elasticity Research Is Based On The Third Round Of Land Use Planning

Posted on:2014-02-11Degree:MasterType:Thesis
Country:ChinaCandidate:J G LuFull Text:PDF
GTID:2269330422965605Subject:Human Geography
Abstract/Summary:PDF Full Text Request
With the rapid development of China’s economy、society and the process of urbanization, therapid increase of population rate have fuelled the demand for construction land. While at the sametime, the land as a limited supply of scarce resources. How to better balance the proportion of land-use contradiction between supply and demand, reasonable and efficient use of limited landresources is the key problem in process planning.The first two rounds of land-use planning is the establishment in the planned economy underthe conditions of the planning. Which can be said there is no flexibility. The third round ofplanning in terms of elasticity has been greatly improved.The preparation process set up elasticregion-conditional construction area. All of them also have certain reservation index. For the futuredevelopment of the necessary leeway. But because of the elasticity planning is still in its infancy,so inevitably there are elastic problems.This paper is aiming at the shortage of the third round of planning in the elastic, respectively,from the planning and management of planning implementation process to launch two. In theplanning process, research of predictive control and release index constraints, constraints on thecontrol index is predicted by three methods, and then the three kinds of planning issued scheme, inthe premise of no affecting the economic and social development and the successful completion ofthe planning objectives, selecting the lowest solution as the best solution, and makes an evaluationon the best solution. The implementation of management in the process of planning to haveappeared or may appeared problem, puts forward to the corresponding solutions and measures toimprove the implementation of planning management in the process of elastic. The main schemementioned or measures are: Planning to modify the local adjustment, Annual implementation andupdate database, Public participation, Adjusting the index, and The mid-term planning.Implementation assessment, execution and local modification, database update annual publicparticipation, adjusting the index, the mid-term planning implementation assessment.Through the research on the planning and implementation of the management process, Ireached the following conclusions, First, to improve the control index prediction and give scientificand flexible planning. Secondly, with the corresponding solutions and measures to implement theplanning management process, making the planning and implementation management processmore flexible, to promote the smooth implementation of the plan, and complete the planning objectives efficiently. From this study, hoping to do an own meager strength to improve the furtherplanning.
Keywords/Search Tags:Land-Use Plan, Constraint control index, Urban-rural constructionland, flexible, Yinzhou District
PDF Full Text Request
Related items