Font Size: a A A

Research On Performance Assessment System Of Zhuzhou Zhijiao City Project

Posted on:2014-08-24Degree:MasterType:Thesis
Country:ChinaCandidate:B PengFull Text:PDF
GTID:2269330425991454Subject:Business management
Abstract/Summary:PDF Full Text Request
The China Minerals Group Co. Ltd is one of the world’s top five hundred companies. The company has the national metallurgical engineering general contracting level, housing construction general contracting qualification as well as a number of professional and technical qualifications and has a number of international management system certification. The company constantly create brilliant at the same time, also cannot ignore the potential crisis:corporate loans increased year by year, the financing risk gradually increased; the company funds increasingly tense, loans increased year by year, the debt ratio is high, the financial risk is increasing; companies charge management fees to the subsidiary company, the project department is only limited to the economic control, economic control the right to be overhead; for the benefit of good project funds not possible, the benefit is not good project, company also subsidized, little into multiple, increasingly heavy burden of the previous year; the legacy of litigation cases, still need to pay by the company, company and branch, the project Department of unequal rights and responsibilities; construction enterprises, the impact on the environment is increasingly concerned, but did not cause the company to. The company also has introduced the state and Hunan, Shanghai Hui Pu and other consulting company on the operation and management of the company are optimized, but the effect is not very ideal.This paper raise comprehensive measurement viewpoint of harmonious development of BT project construction enterprise. Emphasize that the construction enterprises should not only concern their own benefit, but also the benefit of other stakeholders and pay attention to the influences on environment. Take comprehensive measurement to the enterprise and its governors and create win-win development situation between construction enterprise and stakeholder and social environment by making use of the guidance quality of the performance measurement.This paper study on the performance evaluation system based on the Zhuzhou City Vocational Education City BT project as an opportunity establish a performance comprehensive measurement system in construction enterprises. This paper proposes to set up performance measurement system which is appropriate for long-term development of construction enterprise with Performance Prism mode as guiding ideology, BSC as directive framework, index system combining with financial evaluation index and non-financial index and which emphasizes on construction of supporting systems and organizations from view of building a harmonious society. This system can be taken as a reference of performance measurement of domestic construction enterprises.
Keywords/Search Tags:project management, performance evaluation, evaluation system, keyperformance indicators, Minmetals Group
PDF Full Text Request
Related items