Font Size: a A A

A Research On Risk Management Of Real Estate Construction Projects Based On RAC

Posted on:2015-03-17Degree:MasterType:Thesis
Country:ChinaCandidate:W B FuFull Text:PDF
GTID:2269330428975909Subject:Business administration
Abstract/Summary:PDF Full Text Request
Risk for any project, is the existence of an objective category. Especially in the modern engineering project, has the economy, technology and management of various elements effectively com., shown with large scale, many related subjectsand environment cohesion and extremely complex characteristics, determines theconstruction project from the beginning of the project, will be faced with many uncertain factors, which determines the construction project are easy to appearbehind schedule, cost and management control plan correction mutation ordisorderly phenomena, thus reducing the economic benefit level engineering,even failing. And the scientific nature and effectiveness of risk management, it can deal with these issues, we reduce the various risks in the project.The paper, first on the risk management related to the theme of academicliteratures were collected and the main, meaning and methods of risk management are given a comprehensive analysis, which will be the basic content of risk management of construction project field includes both to summarize.Then, after the completion of the theoretical review, this paper introduces TianjinDongli BH real estate project as the main case study in this paper, two kinds of methods mainly adopted WBS (Work Breakdown Structure) decomposition method and risk evaluation index method RAC (Risk Assessment Code), to helpcomplete the discussion and analysis of the risk management of the case the.Take the WBS decomposition method to identify the various types of risk factorsin the project construction; effective evaluation system of this project adopts RACmethod, an important influence to rationally evaluate the risk factors of project ofproject construction. On the basis of risk assessment results, various risk factorshad a significant impact on the project, given the focus on prevention, according to characteristics of the project itself, the risk prevention and risk transfer two risk control measures. Management method of analysis is helpful to RAC and other cutting-edge and discuss the application in the real estate project risk management, is of practical significance to promote the management level of thereal estate field.
Keywords/Search Tags:real estate project, risk management, WBS method, RAC method
PDF Full Text Request
Related items