At present, our country is facing building a high voltage network backbone networkframe, the grid voltage level, the coordinated development of strong Smart Grid, and thesmart grid development cannot leave the support of power transmission andtransformation projects. As an important part of power engineering project, the powertransmission and transformation project is the foundation of the interconnection and thesafeguard which is directly related to the development of national economy and people’sdaily life. The power transmission and transformation project in the process of projectmanagement has its own characteristics. Therefore, establishing and improving thescientific and rational power transmission and transformation project management isconducive to the comprehensive assessment of economic benefit, technical benefit andsocial benefit.This article first can systematicly analyze the research background and significanceof power transmission and transformation project management evaluation, discuss thedevelopment situation at home and abroad of power transmission and transformationproject and power transmission and transformation project management evaluationsystem in detail, thus more clearly demonstrate the importance of technical economicevaluation in the whole process of power transmission and transformation projectmanagement. It is a necessity of project construction and get a better understanding of110kV power transmission and transformation project. Then for Lu Quan Long Fenglake110kV power transmission and transformation project management effect analyses,from the power transmission and transformation project construction organization,construction schedule, construction safety and quality management system andenergy-saving aspect analysis. Finally, using the AHP analytic hierarchy process (AHP)for single factor weighting analysis, and combination weighting analysis, finally todetermine the weight of each index, and fuzzy comprehensive evaluation model is set up,and put forward the Lu Quan Long Feng lake110kV power transmission andtransformation projects fuzzy comprehensive evaluation index system, effectively solvethe Lu Quan Long Feng lake110kV power transmission and transformation projectindicators of uncertainty and the qualitative index analysis of the problems, to ensure thatthe power transmission and transformation project in technical and economic evaluation,make scientific and accurate judgment. |