Font Size: a A A

Investigation On The Parking Facilities Configuration Of Zheng Dong New District CBD

Posted on:2016-06-04Degree:MasterType:Thesis
Country:ChinaCandidate:X X SongFull Text:PDF
GTID:2272330461451269Subject:Urban and rural planning
Abstract/Summary:PDF Full Text Request
As the starting area and the core area of the city industrial upgrading of Zheng Dong New District CBD, the planning design and construction investment are based on high standard, high requirements of the concept, the development has begun to take shape. But with the continuous development of Zheng Dong New District and further development of economy, the amount of vehicle travel is growing fast, the parking problem of internal highlights.According to the Zheng Dong New District CBD internal road parking chaos and public parking resources idle serious situation, investigation and statistics through the configuration and usage of Zheng Dong New District CBD within parking facilities, the deep study on the cause of this phenomenon, finally puts forward the solution and countermeasures. Research thinks, Zheng Dong is not only affected by the internal CBD parking traffic structure, land use, the vehicle has influence factors, factors and people’s travel habits, parking facilities configuration, public transportation convenience and so on.This paper is divided into five parts:The first chapter is an introduction. Pointed out the background of research and significance of the research, the domestic and foreign relevant theoretical research and advanced development experience is summarized, and establishes the research framework;The second chapter is Zheng Dong New District CBD parking facilities construction status research. Analysis of the Zheng Dong New District CBD construction background, the function, the structure of land use and traffic characteristics of, to the intra regional types of parking facilities in the layout of the status, management status and parking induction system are introduced;The third chapter is Zheng Dong New District CBD all kinds of parking facilities of the status of the survey research. For all kinds of parking facilities, a representative object is selected to investigate and find out the problems in its use.;The fourth chapter is Zheng Dong New District CBD parking demand analysis and countermeasure research. Through the analysis of the construction and demand of the building in the Zheng Dong New District CBD, it points out the existing problems in the use of Zheng Dong New District CBD parking facilities and puts forward the solutions and countermeasures.;The fifth chapter is the conclusion and Prospect of the research. This paper summarizes the main research results, and the future research directions were prospected..
Keywords/Search Tags:Zheng Dong New District CBD, Parking facilities, configuration, public transport
PDF Full Text Request
Related items