The Study Of Construction Organization And Management During The Process For HKKZ 12 Tenders

Posted on:2016-06-26Degree:MasterType:Thesis
Country:ChinaCandidate:W WangFull Text:PDF
GTID:2272330461472094Subject:Project management
Abstract/Summary:PDF Full Text Request
China is forming a nationwide high-speed railway network, Shanghai and Queensland customers through the six provincial capital cities, is connected to the East and west of the important high-speed artery, Shanghai-Kunming passenger dedicated 12 tenders are mainly located in the territory of Panxian, Guizhou Province. The section geological condition complex, on the construction process management research is to carry out the necessary premise of the construction. The design of the construction organization is the important technical document for the guidance and organization construction, and it is also the program for the supervision and inspection, the command production and the construction, and also the quality assurance and the time guarantee for the constructionFirstly, this paper reviews the related theories of railway construction project management, so as to the development of Shanghai-Kunming passenger special 12 tenders for the construction of management provides a theoretical basis. On the basis of the Shanghai Kunming passenger dedicated 12 tenders the actual situation to carry on the elaboration, according to the actual situation of Shanghai-Kunming passenger dedicated 12 section design characteristics of the project construction organization structure is determined, and the troop deployment and division of tasks are discussed in detail. Then the Shanghai-Kunming 12 bid of the project of the key management are analyze and formulate specific measures for the management, ensure project smoothly and achieve the established objectives. And the process management of the attack pet is analyzed in detail. Finally, the specific measures through the detailed analysis of the development of the Shanghai-Kunming passenger line 12 tenders of construction management. According to the quality management, safety management, time control management and summer rainy season construction management, the corresponding measures are formulated, and then the smooth development of the project is ensured. And to develop the relevant early warning mechanism.The research for Shanghai-Kunming passenger special 12 tenders for the construction provides specific guidance measures, also for the region and the same geological condition passenger railway construction provides relevant reference.
Keywords/Search Tags:construction organization design, safety, quality, schedule
PDF Full Text Request
Related items