Font Size: a A A

Wudalianchi City Chaoyang35kv Power Transmission And Transformation Project Planning And Implementation Strategy

Posted on:2016-10-23Degree:MasterType:Thesis
Country:ChinaCandidate:L DingFull Text:PDF
GTID:2272330467498097Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
Chao yang Township is a mountain village of Wudalianchi City, the old revolutionarybase areas Township. Chao yang Township People carry forward the hard work fine tradition,to develop township industrial. In recent years, the government has increased strength toinvestment, have been established mountain vegetables processing industry, woodprocessing industry, grain and livestock processing industry, based bracken, fungus,mushrooms pollution, promote economy effectively.With the rapid development of theeconomy and society in Chao yang, electricity supply and demand have become increasinglyprominent. Chao yang Township is now powered from Nen jiang Bai yun substation powerlines with10kV. The nearest village is18km, most villages50-60km, than10kV linepower supply range seriously, line aging serious, line more loss, a serious shortage ofelectricity. During the Spring Festival etc. peak load often limited power, restricted theeconomic development of old revolutionary base areas seriously. With the development ofinvestment work, and commissioning of new projects, promote local economic development,but also to the local power supply and demand become more prominent at the same time. Inorder to promote the development and progress of Chaoyang Township. HeilongjiangElectric Power Company established35kV power transmission project in Chao yangTownship,It is energy construction projects of 《Heilongjiang Province12th Five-Year Planof power development》.In this paper, case analysis the specific Power transmission project of "WudalianchiChao yang35kv power transmission project construction." Power Transmission Project gridsituation were analysis; Power demand analysis and forecasting; Substation access systemsolutions;35kV line construction program;35kV substation building program; Electricalcalculation; System communication, protection, SCADA configuration; Investmentestimation work. And especially in the second chapter introduce electricity projectmanagement, quality management. In order to ensure the project is completed on time andquality, design strategy for the entire project construction and implementation process in thefifth chapter. Under the guidance of project quality management theory, combined withproject quality management focused on project design, construction, post-inspection every stage, summarize quality management methods of power transmission project,and givesstrategy of improve project quality management. Transmission and Distribution ProjectQuality Management Strategy in this paper are certain practical significance for the PowerTransmission Project Quality Management.
Keywords/Search Tags:Plan, Construction, Implementation
PDF Full Text Request
Related items