The Research On Schedule Management Of K Project

Posted on:2017-02-26Degree:MasterType:Thesis
Country:ChinaCandidate:H X HouFull Text:PDF
GTID:2272330482992202Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of the construction industry, construction enterprises between the increasingly fierce competition, the management is also increasingly experience to building construction or real estate development, enterprise operation and management are inseparable from the modern project management mode. To think about the development of enterprises, it is necessary to organize relevant personnel to seriously study and study the construction industry project management,and to learn the management method applied to the practical construction activities,to maximize its role.For a construction project, project management mainly from three aspects of the construction quality of construction projects, construction cost and construction schedule a full range of management of system science, this paper mainly studies the construction progress of the project management. Characteristics of construction engineering project is the first product diversity, in the same building components,different materials, different grade material, different construction technology, the cost is different, the time is different, of course the progress of the projects is different;the second is of great value and building products budget less can reach ten thousand up to billions of. So management of schedule for the project cost impact is very large,time-consuming means more money, "time is money" is reflected in the construction project is particularly evident; the third is building production time long, from construction to completion, or months, maybe a few years. Because of the long time,the progress of the construction of the impact of the foreseeable factors will be many,these factors can not be ignored. If only rely on the experience to deal with, not for scientific analysis, investigation, research to deal with these factors, these factors will affect the completion of the whole project, and even cause disorder in the project,resulting in the loss of huge. So, to use project management schedule management of science and the progress of the preparation of plans, through various channels to collect can have an impact on the construction progress of relevant information,research, the use of scientific management theory knowledge, the preparation of the optimization can adapt to the project construction in the process of dynamic schedule and ensure that the construction project can be successfully completed, these for the construction enterprises and the management is is of great significance.The K project construction progress control research, mainly from K plan of project preparation and progress deviation detection method, schedule control,implementation schedule of security research, in order to ensure the K project works to ensure quality, under the premise of the safety, on schedule to complete the construction task of the target. More and more attention has been paid to the project management, and the research on the preparation and control of the project schedule has a wide range of application and reference value for the future development of the market.
Keywords/Search Tags:Project management, schedule control, construction project, safeguard measures
PDF Full Text Request
Related items