Font Size: a A A

Winder Project Of J Corporation

Posted on:2017-03-01Degree:MasterType:Thesis
Country:ChinaCandidate:Q LiuFull Text:PDF
GTID:2272330503467455Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Because of the support of Chinese government police and the urgent needs from Chinese manufacturing upgrade, the industrial robot industry has entered a stage of rapid development these years and will have bright future. For J company which takes the automation equipment of inductance industry as the strategic direction, how to seize this opportunity? In addition to the positive market strategy, high internal management level and refined Management will also be required.This thesis takes the CD inductance winder project as research subject. Summarized the existed problem from the winder project schedule management issues. Clarified the direction of improvement about project progress management by using the fishbone diagram analysis method to analyze the cause of the problem.This thesis takes Project Evaluation and Review Technique (PERT) and Critical Path Method (CPM) as the main research methods. And combed the CD inductance winder project process from three dimensions about the preparation of project schedule, the optimization of project schedule, the implementation and control of project schedule. Proposed improvement measures within the framework of the project schedule management theory. Not only set up the system of the project schedule management for J, but also give a reference to the SMEs like J.
Keywords/Search Tags:Project schedule management, PERT, Schedule plan, Schedule control
PDF Full Text Request
Related items