Font Size: a A A

Study On The Pat Scheme Of Quannan Expressway Improvement And Extension Project From Liuzhou To Nanning

Posted on:2017-02-15Degree:MasterType:Thesis
Country:ChinaCandidate:J F WeiFull Text:PDF
GTID:2272330503974873Subject:Transportation engineering
Abstract/Summary:PDF Full Text Request
With China’s rapid economic development,traffic volume of the highway is increasing year by year, a lot of highway built in the initial stage of rapid development of highway traffic capacity occurs capacity is insufficient, roads badly damaged phenomenon,and all of this have become an important cause of traffic congestion. These problems of highway have been unable to meet the requirements of normal traffic, and they need to be widen. Pat design of this paper is the core content of Highway rebuilding project, taking this Quannan Expresswany from Liuzhou to Nanning section of high-speed conversion based on studied Highway Pat program.Firstly, we analyz the status of regional road network, project path of road network conditions(environment) and traffic conditions(including traffic flow, such as vehicles, vehicle speed), the main by pass road for the extension period of the item to select it. Project road rebuilding project during normal road conditions and traffic flow during the tourist season, and provide basic data for the diversion of the road network as a whole.Secondly, Quannan Expressway from Liuzhou to Nanning section of reconstruction and extension works of high-speed traffic capacity and service level. Consider factors influencing capacity under construction to modify the basic capacity under different levels of service reduction, combined with foreign research results concluded that sections of roads and bottleneck capacity; also the works of intervals is studied to determine the best works of the project space.Based on highway expansion through design principles and methods, combined with domestic and international research, studied the advantages and disadvantages of the existing programmes of Pat and applicable conditions, depending on traffic volume, traffic composition speed of traffic parameters based on the investigation, analysis, developed a project of road construction traffic organization programme during the extension period. According to the evaluation principles and methods in determining insurance link programme evaluation factors and the methods of evaluation on the basis of the constructed Highway Pat programmes evaluation system, different access to the proposed programme was evaluated.
Keywords/Search Tags:expressway, improvement and extension project, pat scheme
PDF Full Text Request
Related items