The Evaluation On Management Maturity Of Soil And Water Conservation In The Project Of Yizhong Road In The North Shore Of Meizhou Bay

Posted on:2016-04-25Degree:MasterType:Thesis
Country:ChinaCandidate:W T ChenFull Text:PDF
GTID:2283330482460529Subject:Forestry
Abstract/Summary:PDF Full Text Request
The rapid development of China’s economy led to the rapid construction of transport infrastructure development and construction projects subject to soil erosion problems of common concern. With the improvement of water and soil conservation-related laws and regulations, the requirements of soil and water conservation programming unit has been greatly improved, preparation and reporting of the rate of construction project solutions greatly enhance soil and water conservation management practices for the development and construction of the project has positive role. But the management of the development of soil and water conservation construction projects mainly in the preparation of soil and water conservation programs, "two charges" collection and other aspects of soil and water conservation program approval, and implementation of soil and water conservation program implementation, supervision and monitoring of water and soil conservation, soil and water conservation measures inadequate attention to other aspects of management and protection of water and soil conservation management measures to the lack of systematic research on soil and water conservation management elements only qualitative descriptions, no quantitative analysis, management of construction project is not yet mature and become restricted development of land and water projects Loss prevention technology bottlenecks, how to strengthen the management of Soil and Water Conservation of Development Projects Water Conservation sector become a major issue need to be resolved.In view of this, this thesis, soil and water conservation management of development and construction projects in the existing problems, to the north shore of Meizhou Bay in Fujian Putian City in a road project for the study, take surveys and instance validation studies to analyze the combination of conduct soil and water conservation management maturity research and development projects, management maturity quantitatively evaluating development projects, analyzing the development of soil and water conservation management problems in construction projects, in line with the development of a screening evaluation system for project management production practices, proposed to strengthen the development and construction soil and water conservation management of the proposed project, to guide the development and construction project management of soil and water conservation, accelerate soil erosion control has important practical significance. The main findings are as follows:1.Prevention of soil and water conservation project supervision and management, soil and water conservation project organization and management, soil and water conservation project quality management three scores were 4 points or more to reach the strategic level standards. This shows that the north shore of Meizhou Bay in Putian City, a road construction project management Soil and Water Conservation Prevention, Supervision and management, organizational management, and quality management and other related work in place. First, countries have developed corresponding laws and regulations, regulatory documents, technical information, and with the development of water and soil conservation work constantly revised and improved, to implement the construction and implementation of related systems provides a good basis for certain; the second is We realized that the organization is a decisive factor target could be achieved, and soil and water conservation project organization and management is a fundamental element of soil and water conservation project management, organization and management only do this work in order to order to carry out other work; the third is the quality of management by the Soil and Water Conservation attention, and to show in practical engineering, construction unit can compare the basic methods of quality management and quality control of the full application, as well as running water and soil conservation project to establish quality control system, can effectively prevent and deal with quality accident may occur, effectively promote continuous quality improvement, good control of the quality of the incidence of accidents.2.Soil and water conservation project bidding and contract management, soil and water conservation project technical technology management, soil and water conservation project schedule management, soil and water conservation project management supervision and law enforcement of these four has a score of between 3 to 4 points, basically reached the standard grade standard, indicating Putian Management of Meizhou Bay in North Shore City, a soil and water conservation in road construction projects has made some achievements, such as:contract management system to develop more perfect, the contract terms and the tender documents in line with a high degree of "two charges" system for the implementation o f very good. But some work is still not in place, first, awareness of the law and norms of the contract change process owner and the construction side of the poor; the second is water conservation technologies in science and technology management, weak, inadequate investment, attention lower; third is poor synchronization or Cohesion construction unit coordination and practice with the plan, construction of management thinking, management methods, management tools, risk management, unscientific, is not precise enough; four water quality supervision and supervision of the administrative departments of the project owner is not strong enough, not enough to participate, there is no timely follow-up supervision.3.Soil and water conservation project completion and acceptance management to assess the results of the management and protection of soil and water conservation management of these two indicators were scored 2 points or less, according to the text of the development of construction project management maturity evaluation criteria two indicators shows that only these two indicators It reached a development standard. This is mainly because the soil and water conservation project at the end, most of the owners to carry out the main project of acceptance, but acceptance of the special soil conservation facilities to carry out almost no; the end of the project, rarely have the owners of units in accordance with relevant laws and regulations The regulations to strengthen soil and water conservation facilities and their treatment outcomes management and protection.
Keywords/Search Tags:Development and Construction Projects, Soil and Water Conservation, Management Maturity, Appraisal, Putian
PDF Full Text Request
Related items