With the development of project management system, people are increasingly concerned about the project risk management. Since there are many factors which can affect the project risk as well as the characteristics of the project itself, it’s not easy for the work of project risk management. All the project management personnel should study how to improve the capacity of project risk management based on the project actual situation.The topic is discussing the impact on the project risk for the owner, contractors and the SA management company during the quality warranty period of SA service apartment project, mainly for the risk of quality, schedule, cost and scope of the contract and personnel management. Through the professional technical method and analysis system, namely AHP method, bringing out the main risk, i.e., contract risk, using the risk management theoryand the feasibility analysis system, drawing up the specific measures and implementation plan, and the contract risk management measures for further improvement. |