Font Size: a A A

Esearch On The Scope And Risk Management Of Traffic System Management Optimization Project In Nanning City

Posted on:2014-07-11Degree:MasterType:Thesis
Country:ChinaCandidate:Z L LiFull Text:PDF
GTID:2309330431984912Subject:Project management
Abstract/Summary:PDF Full Text Request
Traffic is the lifeblood of a city development. Efficient traffic engineering system, scientific management is the guarantee of city traffic "pulse" health, vitality to beat the decisive conditions. With the rapid development of social economy, Nanning faced up with the fast growth of motorized traffic, traffic facilities, the obvious contradiction between supply and demand caused by the heavy traffic, order confusion, frequent accidents, such as "city disease" problem, start and optimization project in Nanning city traffic system management, to improve the urban traffic system management level, the purpose of improving the traffic of the city. Due to the complexity of transportation system structure, as a project owner to achieve more, and every project there are a variety of large and small risk, the traditional project management experience is difficult to meet the demand for project management effectively. Under this background, from the perspective of project owners, the Nanning city transportation system optimization of the scope of the project management and risk management system, more in-depth research. Based on the comprehensive analysis of the project scope management and risk management on the basis of the research status at home and abroad, using the work breakdown structure, project management, SWOT analysis, brainstorming method, analytic hierarchy process (ahp) and the methods of theoretical analysis and empirical analysis, with the instance of Nanning city traffic system management optimization program, through the project scope definition, establishing WBS decomposition structure diagram, from the Angle of two working process decomposition and function decomposition optimization project of Nanning city traffic system management research and analysis, and uses the expert investigation method, SWOT analysis, risk analysis methods, such as brainstorming method, on the project risk identification and assessment, according to the results of risk analysis for the major risk factors to take the corresponding risk prevention measures. From the perspective of project owners, explore a set of has a certain theoretical value and practical application of the traffic system of the optimization of the project scope management and the application of risk management mode.
Keywords/Search Tags:Nanning, Traffic System, Management Optimization, Scope Management, Risk Management
PDF Full Text Request
Related items