Study On The Control Of Project Schedule Based On Resources Confine

Posted on:2015-12-18Degree:MasterType:Thesis
Country:ChinaCandidate:F XueFull Text:PDF
GTID:2309330452459689Subject:Project management
Abstract/Summary:PDF Full Text Request
With the booming economy development in China recent years, the number andsize of construction projects increase every year. At the same time, the schedulingmanagement requirement of construction projects should be paid more attention to.A reasonable, economic schedule of construction can ensure that the project issuccessful. The control and distribution of progress of construction is a major part ofthe progress management. It determines whether the project is successful or not, andrelated to the profit and reputation of all the participant of the construction. So in theprocess of construction, it’s really important to control the schedule and progress ofthe construction.The dissertation discusses the basic theory of the schedule management,introduces the reasons and methods of schedule weaving, and expounds the basictheory of construction project scheduling control theory and procedure inconstruction project. Combined a construction project in Jin wan Square with thetheory, deeply analyses that based on the scheduling control method of projectresource management and effective construction progress control measures duringengineering construction.Summary the whole passage in the end, using the method that combinestheory and practice, raise several controlling measures which are benefit on processcontrolling、operable and effective.
Keywords/Search Tags:schedule management, project resource, influencing factor, control measures
PDF Full Text Request
Related items