Font Size: a A A

Research Of Aircraft Final Assembly’s Organization Risk Management

Posted on:2016-05-11Degree:MasterType:Thesis
Country:ChinaCandidate:B LvFull Text:PDF
GTID:2309330476452715Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of science and the world economy, the plane has become an indispensable tool of traffic life, the important role of civil aircraft of the people’s livelihood and national economic increase, the civil aviation development ushered in the new historical period.The large aircraft project is a national key project, is of great strategic significance to the transformation of economic structure and industrial development. But the development of aircraft is a long cycle, high risk project. From international practice, experience, often due to inadequate risk management organization, resulting in cost overruns, delay in delivery problems, caused huge losses of project. as the important part of the aircraft development, it is very important to research organizational risk management of aircraft assembly manufacturing project.Firstly, from the general project risk analysis, to identify the main factors which influence the project risk, expounds the types and characteristics of risk factors. Focus on the research of aircraft assembly manufacturing project risk, focusing on developing risk partners on aircraft project risk, lays the foundation for the follow-up research; comprehensive risk analysis of types of aircraft assembly manufacturing project contains, the organization goal, organization structure, organization system, execute cooperative organizations such as risk factors, analysis framework the relevant organization risk, and leads to establish suitable for aircraft assembly manufacturing system of risk management.Secondly, using the method of questionnaire investigation, through the actual investigation and access to relevant data, analysis, for further statistical theory to provide the necessary basis, to further improve the research conclusion. Application of membership degree function analysis, deleting the less important factors, determine the key factors.Third, in the course of this study, in order to obtain relevant data of aircraft assembly manufacturing project risk, used the method of expert investigation, selection of aircraft assembly manufacturing project professionals and experts as object, ask experts opinions to modify the investigation report. By using the analytic hierarchy process to determine the weight coefficient of each index, select the 12-15 relative to the most important aircraft assembly manufacturing organization risk factors from 18 factors, determine the weight factors and sub factors with the survey data, the establishment of evaluation in the organization model of risk factors and management system, in order to qualitative and quantitative the combination, decision-making and evaluation of comprehensive on organizational risk.Finally, this paper uses a case study method, The evaluation of study results were applied to the aircraft assembly manufacturing project organization, to verify the effectiveness of the risk model. And then put forward the adjustment and optimization of the project organization measures, optimization of the project management organization, the project responsibility, professional ability construction responsibility and resources to support the responsibility of the three line of separation, functional clear, carry out their duties, to break through the bottleneck, the effective control of risk, shorten the development cycle, to ensure product delivery on time.Through the study of aircraft assembly manufacturing project organization risk management, come to 4 conclusions. According to the research limitation, proposed the further research direction, has important significance for risk management of civil aircraft project, military aircraft projects and other high-tech aviation project...
Keywords/Search Tags:Aircraft Final Assembly, Project Organization, Organizational Risk, Risk Management, The Analytic Hierarchy Process
PDF Full Text Request
Related items