LOG Project Cost Control Study Of M Company

Posted on:2017-02-14Degree:MasterType:Thesis
Country:ChinaCandidate:J H BaiFull Text:PDF
GTID:2309330482471773Subject:Project management
Abstract/Summary:PDF Full Text Request
With the application and development of project management theory, we recognize the difficulty and importance of cost control in high complexity and uncertainty project. In the project implementation process, we must consider the main factors of time, cost, quality, safety, scope and risks. Because any factor changes are likely to affect the project success or failure. Based on this, an integrated project management is increasingly becoming the modern project management academic research and discussion of hot spots.In numerous studies theory, the content of the project integration management to discuss many, but the actual implementation process technology is relatively small, which is bound to the research results into productive forces obstacle. Therefore, this paper will be an example for the actual LOG project cost control studies, and the research will focus on Estimation of Risk Cost and Earned Value Management.Thesis is divided into six chapters. Chapter Ⅰ and Ⅱ will introduce the main cost control thesis, significance and the cost control development at home and abroad nearly 20 years.Chapter III, will analyze project cost control problems of M enterprises in the past 10 years, including the deficiency of cost control management, cost control problems existing in the process of project risk and project cost/schedule integrated management.Chapter IV, briefly introduces the situation of M enterprises, and study the optimization scheme according to the enterprise actual situation. How to improve the mechanism of project cost control management, how to optimize project risk identification and assessment process, how to measure risk cost, and how to use the earned value theory of project cost/schedule integrated management.Chapter V, apply the proposed optimization schemes to in LOG Project. To check and verify the application result of project cost control.Last Chapter VI, summarizes application result, review optimization scheme and continue to study and put forward further prospects.
Keywords/Search Tags:Project Cost Control, Risk Cost, Earned Value Management, Integrated Management
PDF Full Text Request
Related items