Font Size: a A A

Research On Progress Management Of Mexico Volkswagen A1 Drive Draft Project

Posted on:2017-04-29Degree:MasterType:Thesis
Country:ChinaCandidate:F K MengFull Text:PDF
GTID:2309330503484789Subject:Project management
Abstract/Summary:PDF Full Text Request
As China become the world’s largest car producer, auto parts enterprise development by leaps and bounds. All auto parts enterprises intensify research and development, in order to be able to and vehicle makers synchronous development,effective implementation of the auto parts industry project schedule management has great realistic significance.In this paper, from a sino-us joint venture development of VW Mexic A1 drive shaft project as the breakthrough point, on the basis of the basic theory of project schedule management, first of all, in combination with the practical situation of enterprises, analyzes the VW Mexic A1 drive shaft project organization, project management processes,project schedule management process;Then on the basis of the existing project organization structure, develop the VW Mexic A1 drive shaft project schedule, include OnePager timelinge, project timeline, project sub-task, etc.; Then Based on analysis of the progress of priority projects in the VW Mexic A1 drive shaft project schedule control. Taken together, the paper from the project systems analysis,project plans, project progress control and so on several aspects to the enterprise existing schedule management system made the improvement.Research on how to manage the project schedule, the project schedule management of auto parts industry is of great significance, this article research results for the domestic auto parts industry enterprise project schedule management standardization standardization provides reference.
Keywords/Search Tags:project management, project schedule management, VW Mexic A1drive shaft, project process control
PDF Full Text Request
Related items