| SGQG hot pickling line for SG Design Institute turbulent shallow trough push-pull pickling line,belonging to a single volume independent pickling intermittent production line,suitable for thicker and higher acid strength of hot-rolled sheet wash products mostly low-end products,compared to the continuous pickling line,surface quality,shape,etc.does not have a competitive advantage.With the steel market gradually excess production capacity,market oversupply in the form of increasingly prominent,the competition has heated up the stage,in order to further improve product efficiency,SGQG hot-rolled products to high-end transformation plan,which is thinner,wider,more accurate products for the pursuit of higher profit margins,which requires production line equipment upgrades in order to provide the necessary hardware support,so the proposed SGQG hot pickling line improvement projects,broken scales increase tension leveler,hot gauge transformation,the surface quality detector,edge drop and other equipment.First article on the project schedule management theories and literatures statements,including the concept of the project schedule,preparation methods,and project schedule control concepts,contents,methods,etc.,followed by pickling line for hot-rolled SGQG improve the characteristics of the project,especially required in the case of the normal operation of the production line equipment upgrades and improvements to the project schedule control put forward higher requirements.By analyzing the overall situation SGQG hot pickling line improvement projects,including project background,project content,project objectives,etc.,combined with relevant theory and knowledge management project schedule,the use of an exploded view plans,network planning chart,Gantt chart,the key point of law,knowledge content,analyze the problems and uncertainties SGQG hot pickling line improvement projects that may exist,and analyzes problems that may occur for various reasons,and to propose solutions and programs,and finally developed a suitable for this project the schedule and schedule control. |