Font Size: a A A

Study On Construction Engineering Claims By Olympic Underground Space

Posted on:2017-06-01Degree:MasterType:Thesis
Country:ChinaCandidate:M W GuoFull Text:PDF
GTID:2322330482491170Subject:Project management
Abstract/Summary:PDF Full Text Request
In the construction management of our country,claim and its management is still a relatively weak link,at present most of the construction enterprise to claim lack proper strategies and techniques,lead in this claim should obtain benefits but not the profit.Therefore,the research on how to deal with Hirsch Pipe Industry and trade claims which possesses very important practical significance for the enterprise,at the same time of construction projects in China bearing market norms management contracting,accelerate conform with international convention,to carry out on the engineering cost control method research has certain theory significance.This paper mainly in the UK underground space utilization project as an example,in the research of construction process based on the examples of in-depth analysis of all kinds of construction claim,hope to find out more effective claim strategy,in order to improve the skills in claim management of construction enterprise,and expect the space under the Olympic use project compensation philosophy and thinking,to give other companies in the construction stage carried out claims provide some inspiration and reference.
Keywords/Search Tags:Olympic sports, The utilization of underground space and engineering, Construction claims, Problems, Research, Countermeasures
PDF Full Text Request
Related items