| Ying Shui Ba project in hebei province for the implementation of chengde government for big government "three years thanks to" political project and also a "popular project",the project is located at busy chengde city,can say the project within " relates to politics"、"relates to the economy"、"relates to the social stability".No matter from engineering quality,progress,safety,civilized construction for us all aspects such as raised very tall requirement.Difficult construction,high quality requirements.Progress management is a successful implementation of the construction project and the key project,especially for those nervous,or economic benefit greatly influenced by the time limit of construction engineering projects.Progress management is the contractor according to contract provisions schedule,quality and the budget of the investment required to perform engineering construction tasks,and for enterprise to obtain reasonable profits.Project quality,complete can directly relates to the project,will play of the economic and social benefits,and also determines the construction contractors’ expected returns,realizing the goal of the degree of influence construction enterprise survival and development.Based on project management knowledge as the foundation,by engineering construction to Ying Shui Ba Project as an example,this paper expounds the project schedule and control principle,process and method and its application in engineering practice.This article first on the analysis of domestic and international engineering project management development situation and the development trend of first built group was introduced on the basis of project management and project construction schedule management,introduces the basic theoretical knowledge to Ying Shui Ba project summary,project emphasis and difficulty,project joint management mode and the project layout,and then discusses Ying Shui Ba project goal request to meet,according to the project schedule planning steps to engineering breakdown structure,process table,network planning,key circuits,network optimization,feasibility analysis for a detailed introduction.Meanwhile,according to the actual schedule and schedule comparative analysis results,to keep the project period unchanged,ensuring the quality of projects and consumed with a minimum as the goal,take the pointed measures,progress of adjustment,through the dynamic monitoring and progress adjustment method proposed influence factors of the solution. |