Rearch On The Schedule Management Of Wet Film Air Conditioning Construction Project In Shenyang Telecom

Posted on:2015-12-01Degree:MasterType:Thesis
Country:ChinaCandidate:J ZhaoFull Text:PDF
GTID:2322330512971365Subject:Project management
Abstract/Summary:PDF Full Text Request
With the owners of the scale of construction projects and quality requirements increasing,the construction schedule requirements more stringent,construction progress control work has become a key link in the project management,the project can be smoothly construction plays a decisive role,but also related to the interests and reputation of the construction unit.Effectively control project schedule to play a positive role in enhancing the level of project management,save the project cost and shorten the project duration.Schedule control method using the project on economic benefits of construction unit and project control has significant effect.This paper first introduces the concept of project,then introduces the research status of project management at home and abroad,and considering the actual construction situation of Shenyang Telecom wet film air conditioning project,based on the principle of schedule planning project,analysis of the theory of project and specific construction condition,were the preparation of project schedule,then the project schedule control,combined with the practical project,method and effect analysis and research project progress control,optimization of the project schedule,completed the plan of Shenyang Telecom wet film air conditioning project work,the final schedule for the project the implementation of safeguard measures,to ensure that the project construction process can be safe and efficient completion of construction,on the theoretical system of the project control,can give the construction project guidance.The application of the network schedule plan in the project,and is the Gantt chart schedule the schedule for the project can be compiled,each project schedule project good arrangement of the task and shorten the duration of the effect,for the successful completion of Shenyang power letter wet film air conditioning project theory and practice guidance.
Keywords/Search Tags:Air-conditioning construction, The project plan and control, Gantt chart method
PDF Full Text Request
Related items