Font Size: a A A

Post Evaluation Of Integrated Housing Production Workshop

Posted on:2018-08-14Degree:MasterType:Thesis
Country:ChinaCandidate:W G JianFull Text:PDF
GTID:2322330515982452Subject:Engineering
Abstract/Summary:PDF Full Text Request
Post project evaluation is an important tache in the project life cycle,is a continuation of project evaluation.Through project evaluation can be summed up the successful experiences and lessons from the practice of various stages of the project life cycle analysis of the completed project to analyze and evaluate a systematic and objective and to determine the project objectives,purpose,effect,achieve the level of benefits.In recent years,F production workshop area continues to expand the scale of investment,the number of production enterprises increased,the new point of economic growth continues to show strong pull workshop industrial production growth.However,the F production workshop area of the project in the process of construction and operation are also some problems,lack of follow-up evaluation of the workshop project and the supervision mechanism,the construction and operation of the low efficiency of integration between RV project.Therefore,further establish It is of great practical significance to improve the post evaluation system of F production workshop to improve the level of scientific supervision and to promote the development of high quality workshop.This paper takes the H company F production workshop area through the park after the introduction of the project evaluation workshop as the main research object,starting from the theoretical research,investigation and Analysis on the actual development of the F production workshop,production workshop in F project based on the evaluation system and method system by combining qualitative analysis and quantitative analysis,the evaluation system is constructed F workshop characteristics of the project.The specific content of the system includes the basic design idea of the construction of evaluation system of F workshop project,post evaluation index system,evaluation method selection,index weights,evaluation criteria set,analysis of several aspects of the evaluation result.Through empirical Research on behalf of F production the workshop area of project analysis,to verify the application effect of the comprehensive evaluation system,the conclusion of the post project assessment is drawn.In addition,the evaluation for the protection of the F production workshop area project Effective implementation of the system,this paper put forward the project after the implementation of the evaluation system and the operation of the implementation of the measures.
Keywords/Search Tags:Integrated car, Project evaluation, Safeguard measures
PDF Full Text Request
Related items