| This paper takes Weifang Hengxin Yongxiang Garden Phase two project as the research object,based on the current situation of the development of project quality management theory,using the Scientific Theory of Project Quality Management,in-depth analysis of the problems existing in the quality management process and solutions,to provide guidance for the project department to carry out effective quality management work.The main contents of this paper include: first,on the basis of introducing the research background of this paper,we elaborated the purpose and significance of the research,and reviewed and summarized the research results in related fields at home and abroad through literature review.Second,after the introduction of Weifang Hengxin Yongxiang court two the basic situation of the project,design,layout,main characteristics and requirements of quality inspection,the influence factors of engineering quality and quality control work are analyzed,combined with the tracking survey on the implementation of the project,summarizes the quality management problems existing in the project.That the preparation stage mainly exist the technical documents of the project preparatory work before construction and construction work is not in place,not timely establishment of project quality management mechanism,design and construction plans of the project change management is not in place,the procurement of raw and auxiliary materials lack of effective quality management and tracking and other issues in the project construction site,the lack of quality inspection;project quality management process control is not clear,the construction process of the key quality control mainly exists in the construction phase of the project The control is not in place and the quality of the project in the hidden engineering problem of the lack of track inspection and focus on the prevention of quality problems;in the project completion stage of early engineering acceptance procedures missing,not formal implementation,the completion of the entire project quality inspection is not complete and did not set up a quality management information system etc..Again,clarify the basic ideas of Weifang Hengxin Yongxiang Garden Phase two project quality management,starting from the quality assurance point of view,focusing on the strategy and implementation of the construction process of the system to ensure project quality,project quality control and focus on the perspective of the whole process,the preparation stage,construction stage,completion acceptance stage of quality management measures the analysis.Finally,it analyzed the Weifang Hengxin Yongxiang Garden Phase two project quality management countermeasures from the personnel organization,system,technology,materials,machinery and equipment aspects. |