Font Size: a A A

Planning And Distribution Of Engine Assembly Line Material

Posted on:2018-10-03Degree:MasterType:Thesis
Country:ChinaCandidate:R X DongFull Text:PDF
GTID:2322330542460619Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
Taking the production workshop of Jiangxi T company as the object of study,according to the actual situation of the company,and analysis of the material process,the functions of the enterprise in material distribution,draw up the material distribution plan that accords with the actual demand of enterprise.Taking Microsoft Visual Studio 2010 as the development platform,and taking SQL Server 2008 as background database,using C#as the main language,taking the HTML,JavaScript,jQuery and other front-end as production language,at the same time,using.NET and other development technologies,reasonable planning of the engine production line of a company,and the material distribution system is developed.According to the actual demand,the system is divided into six parts to plan and design,which include warehouse management,material correction,EP pieces of material distribution,self-made parts material distribution,and the material error proofing.Determining the material delivery plan through the material required of the production plan,then pull the material through the assembly station.In the process of material storage,needing to scan the bar code to verify the material,in the management information system issued the production plan to MES.according to the actual demand of the workshop production plan,MES needs to analyze the production plan,sort the order and other words.hen push it to the material delivery system.Taking advantage of the PFEP tables passed by MES.Production planning information,the material distribution system generates the station material requirements.warehouse personnel need to unpack the materials according to the actual production requirements,collect material according to the material information on the work order material list which has been printed out:In the process of sending material to the sorting area,outbound processing is required,in order to ensure the convenience of subsequent material inventory arrangement.Before the operator accepts the delivery order online,the service material also need to be checked,to determine the quantity and model.When receiving the material after receiving the delivery order,needing to scan the material box label of this material.Through the rational planning and distribution of the material in the engine line,it can make the production more transparent and lean,to some extent,the production efficiency and accuracy have been improved,and considerable benefits have been brought to the company.
Keywords/Search Tags:Production line, engine material, distribution
PDF Full Text Request
Related items