Font Size: a A A

A Study On The Project Schedule Control Of A Geothermal Heating Project

Posted on:2017-04-19Degree:MasterType:Thesis
Country:ChinaCandidate:L Z WuFull Text:PDF
GTID:2322330566456462Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
This paper systematically discusses the project management of the latest research situation home and abroad and the related basic theory knowledge;then according to the actual situation of the first phase of the Yanqing municipal heating project,analyzed its existence in the progress of management problems,and analyzes the problems andthe corresponding solutions;and then from the general theapplicable,strong operability roundly and systematically discusses the implementation,examination,improved dynamic control to the examination schedule of project.Using WBS analysis method,the project will target decomposition layers,improvement and selection of the mode of the existing schedule management,establishing the guiding ideology of progress,as well as the main contents of project coordination and management of preparatory work,the project schedule and project management controlcontent.So that the total targetand enterprise project schedule control is consistent.This paper has distinct for operability and practicality,strong research value.Therefore,the people are one step closer to understanding the project schedule management and other related knowledge,guidance in the relevant work of staff,has great reference value and guiding significance.
Keywords/Search Tags:Project management, operational, theory, measures, guidance
PDF Full Text Request
Related items