Font Size: a A A

Administrative Office Building Since The Mechanism Of Optimization Management System

Posted on:2015-06-30Degree:MasterType:Thesis
Country:ChinaCandidate:B Y CaiFull Text:PDF
GTID:2336330461973432Subject:Accounting
Abstract/Summary:PDF Full Text Request
Today of In the economic development, the administrative organ to centralized management to build a comprehensive office building?Administrative office building is a special office for scientific research, inspection, testing requirements, has the certain particularity, relative to other public project investment smaller, in the process of construction the construction units generally adopt self management model, is the self construction system call. The government agent system in China belongs to the preliminary stage, the expected effect has not reached the process, such as government investment in the construction of "super three" phenomenon has not obtained the substantive control, power rent-seeking, corruption events occur frequently, the benefit of investment is usually not able to maximize. The necessity and urgency of the government departments have been aware of the administrative organ to invest in the construction of comprehensive office building project management approach to reform, to carry out active exploration, in order to achieve good results. Management method of the purpose of this paper is to seek an increase investment efficiency, save money and time to achieve a good construction effect. This paper takes Ningde Z Bureau office building management as an example of management analysis, optimizing management mechanism from the perspective of the construction unit, to achieve quality objectives, the construction unit cost, schedule, safety target from the decision design stage began to the end of the building were elaborated using stage.In this paper, on the basis of the actual case of risk prevention, put forward to optimize the corresponding supporting system and the corresponding management mechanism, to implement the whole process control of engineering cost management. Construction must experience the scheme argumentation, investigation, design, construction bidding and implementation stages, starting from the whole process of construction, each stage, to strengthen the process control of engineering cost, ensure rational use of cost of capital. And strengthen the construction contract management by legal means instead of administrative measures, control the contract change, design changes and visa. Finally, should the internal supervision mechanism, external supervision measures and implementation process audit common supervision of the entire surveillance system.Analysis of system analysis and problems of the administrative office building construction project management, and to Ningde Z Bureau as an example, Based on the analysis of the project management flow chart, on China's administrative organs office building construction project investment process, from the process of time Pointed out the main disadvantages of traditional government investment project management mode.the optimization of the self system to do a case analysis. The use of SOWT, game theory, and from the cost control perspective, analysis of the matching conditions, due to the possible problems and reasons for making, and optimization of the recommendations put forward corresponding.
Keywords/Search Tags:Administrative organ, comprehensive office building, building, construction, optimization
PDF Full Text Request
Related items