Study On Problems And Countermeasures In The Administrative Examination And Approval Of The Construction Project Of Nansha New District Of Guangzhou

Posted on:2017-11-11Degree:MasterType:Thesis
Country:ChinaCandidate:Y X LeiFull Text:PDF
GTID:2336330536453049Subject:Public administration
Abstract/Summary:PDF Full Text Request
In Nansha,Guangzhou,the investment and construction of the project shall take a long time from the project initiation to acceptance,while most of the approvals belong to the sequential approval.The prolonged approval time goes against the needs of the social development,since it increases the operating costs of the enterprises and the administrative costs of the government,reduces the work efficiency,as well as delays the schedule of the construction projects and the pace of the economic development.Although Nansha conducted the reform of the parallel approval in 2013,it still failed to achieve the objective since several problems arise in the process and most enterprises still preferred the sequential approval.Therefore,a study of the administrative approval system and process of the construction projects to find the real solutions to the “difficult,prolonged,cumbersome and complicated” approvals has become an important and realistic issue.This paper introduces the background,the content and the current status of the approval process of the construction projects in Nansha New District of Guangzhou.Following the analysis mentality of “current status-problems-causes-measures”,based on the studies of the relevant literatures and in the perspective of the overall management,this paper,by means of the questionnaires method and interviews,summarizes the problems of the pilot program in terms of the approval system,the approval process and the supporting e-government system,and analyzes the reasons for the problems with the new public theory and the business process reengineering theory.To solve the problems,with the reengineering of the approval system and approval process as well as the integration of the e-government system,on the basis of clearing up the approval items,the author proposes to establish an efficient coordination mechanism between the approval authorities with the e-government center as the physical carrier and the administrative approval bureau as the approval agency,improve the approval process,and raise up the optimization suggestions by means of the approval system innovation.This paper is mainly divided into three parts: the first part is the introduction and the relevant concepts and theories,which mainly expounds the background,the significance and the methods of this research,and makes a theoretical summary of the current status of the study on the administrative approval of the construction projects.The second part analyzes the current status of the administrative approval of the construction projects in Nansha New District,the problems along with the administrative approval of the construction projects,and analyzes the reasons in terms of the approval system,the approval process and the supporting e-government system.The third part introduces the experience of the advanced and developed areas,and with the practical situation of Nansha in mind,proposes the measures to improve the administrative approval of the construction projects in Nansha New District.This paper concludes that,the experience of the advanced and developed areas can be learnt and the practical situation in Nansha New District shall be considered during the reform and development of the administrative approval of the construction projects in Nansha New District.Thus Nansha New District can establish and improve its own law and regulation system,re-engineer the approval authority,adopt a simplified parallel approval process,integrate the existing administrative approval system,promote the electronic license,and strengthen the approval result sharing mechanism to ultimately realize the optimized development.
Keywords/Search Tags:construction project, administrative examination and approval, process engineering
PDF Full Text Request
Related items