Research On Management And Optimization Of Thermal Power Project Investment Plan Of G Power Company

Posted on:2018-12-13Degree:MasterType:Thesis
Country:ChinaCandidate:Q ZhaoFull Text:PDF
GTID:2359330518455385Subject:Engineering
Abstract/Summary:PDF Full Text Request
In the current international and domestic economic situation,corporate profitability is going down,compared with the previous period,the companies have adopted a tightening investment policy.Investment planning management is a leading investment management system,an important management tool to guaratee the layout and pace,it plays an important part in the whole business performance management chain.How to deal with the project investment reasonably is the most pressing problem at present.In the new period of investment planning we should change the previous rough management model,and strengthen the detailed management in order to handle the increasing market risk of elective power investment projects and even improve the efficiency and accuracy of investment,ensure the overall investment benefit of the project.This thesis adopts the way of combining literature research,summary with action study.Based on the analysis of the current investment plan management of thermal power infrastructure projects,the initial review of annual investment plan,annual investment plan review,investment plan to complete the assessment and other investment plan management status,planning management system are optimized study from the strategic level to seize the main problem and the main aspects of the problem of investment plan management.First of all,the initial review of the annual investment plan should focus on the rationality of the total investment plan,as a sample of millions of units thermal power infrastructure projects,to complete the project investment plan and the main progress node,as well as the main equipment for power plant's payment conditions and the main progress node.The large amounts of data would be analyzed,researched,and then a matching relationship in the completion of the investment plan will be established,the main equipment for power plant's payment conditions and the main progress node included.Secondly,according to annual investment plan review.It is a necessity to grasp the rhythm of the investment of the thermal power project,and optimize the design of the main boundary conditions of the financial evaluation of the existing thermal power project according to the market and the practical principle,and construct the economic,construction,technology,environmental protection and other indicators of the thermal power project investment planning sequencing decision-making index system,in order to achieve the goal of "select a superior solution from superior solutions",and in accordance with the principle of comprehensive benefits to arrange construction funds.Finally,complete the assessment for the investment plan,offer a proposal to increase the depth of investment planning assessment,from a single indicator to optimize the establishment of multi-index assessment system.We also verified the practical and effective of the results of the investment plan management optimization research.This thesis has some reference significance for the electric power generation company to control the investment plan of the thermal power project,which has certain reference value for the restriction mechanism of strengthening the investment risk,the scientific decision-making.
Keywords/Search Tags:Thermal power project, Investment plan, Management optimization, Financial analysis, Comprehensive evaluation
PDF Full Text Request
Related items