Font Size: a A A

A Study On The Improvement Of The Vanhe Family Residential Development Project Cost Management In Siping City

Posted on:2018-08-01Degree:MasterType:Thesis
Country:ChinaCandidate:M ZhaoFull Text:PDF
GTID:2359330536459130Subject:Business Administration
Abstract/Summary:PDF Full Text Request
A real estate development project success factors are many,the cost management is very important in every link and a key ring,cost and cost of scientific and rational control of real estate development project,is the current real estate development projects to maximize benefits,and eventually be able to gradually realize the development project the success and development of the most fundamental guarantee.Responsible for the impact of real estate development projects of enterprises in the same industry at the present stage of fierce market competition and the national overall tightening regulation of real estate policy,in order to achieve the ideal economic benefit,and realize the maximization of profit of real estate development projects,we must fully take work to re transfer,reduce the cost of development from the source,and strengthen the cost management and control.In this paper,the project of Siping City Vanward family residential development as the research object,this paper discussed the first theoretical research contents and methods about the research background,the existing and practical significance of the thesis,the overall domestic and foreign related research,as well as the innovation of this paper,and based on the concept of real estate development projects,real estate the development of project cost of real estate development project cost management concept and principle of relevant theoretical basis a detailed description of the current situation of the project of Siping City Vanward family residential development cost management are analyzed,present situation,present situation of cost management,cost management mainly includes the project of Siping City Vanward family residential development as well as the issue of cost the management of the causes of the problems,and then put forward the improvement project of Siping City Vanward family residential development cost management The design goal and principle scheme,and from the development of the design,bidding,construction,completion and acceptance of four stages of cost management put forward specific improvement scheme,and puts forward the three aspects of the system,information and human resources guarantee to improve the implementation of the scheme,finally put forward the conclusions and Outlook,carried on the comprehensive summary.
Keywords/Search Tags:Real estate development project, Cost control, Improvement
PDF Full Text Request
Related items