Font Size: a A A

Research On The Schedule And Risk Management Of Liangshan Mobile Corporation

Posted on:2018-06-26Degree:MasterType:Thesis
Country:ChinaCandidate:B WangFull Text:PDF
GTID:2359330542978029Subject:Engineering
Abstract/Summary:PDF Full Text Request
Big data project is Liangshan Mobile Corporation to obtain important information platform for the further development of the telecommunication market in supporting the project,the project research and development technical difficulty,long period,high cost and schedule management work is difficult,the energy consumption of Liangshan mobile platform big data project as the research object,through the analysis and discussion of related risk factors of the project progress management work of big data the exploration of more effective and scientific progress risk analysis and management control model.In this paper,the project schedule management theory and methods are used to study the schedule management of Liangshan Mobile Corporation energy platform.An in-depth analysis of existing Mobile Corporation in Liangshan energy consumption big data platform project schedule management problems,these problems mainly for project schedule planning is not reasonable,the project implementation process and schedule deviation in the project implementation process,technology and so.Based on the analysis of the problems in the progress management of the big data project of the Mobile Corporation energy consumption platform in Liangshan,this paper puts forward the solution to the project schedule management and the method of controlling the progress.Secondly,based on the theory and method of risk management,through consulting Liangshan Mobile Corporation big data platform project energy experts,using the risk list method to identify project risks,and using AHP and fuzzy comprehensive evaluation method to evaluate the risk factors.Through risk identification and assessment,this paper draws the research project risk,design risk,development risk,test risk,organization risk,cost risk and other risks,including the development of the risk research,the risk is relatively large,test risk,design risk,organization risk and cost risk is medium.According to the results of risk assessment,this paper puts forward targeted measures to deal with risks,and enhance the level of risk management of large data projects in Liangshan Mobile Corporation energy platform.This paper mainly solves the following problems: one is the lack of in-depth analysis of Liangshan energy Mobile Corporation big data platform in the process of project construction schedule management and risk management in the two aspects of the problem;two is in the management of the project schedule management theory and risk control theory and tools are applied to the process of construction of big data platform project of Liangshan energy Mobile Corporation in solving the problems existing in the construction of the project;ideas and scheme in this paper is dedicated to providing a platform for large data processing Mobile Corporation of Liangshan energy project implementation problems,can provide some reference for the construction of other similar projects.
Keywords/Search Tags:big data project, project schedule management, project risk management, energy consumption platform system
PDF Full Text Request
Related items