Risk Management Research On The Construction Phase Of KL Project

Posted on:2017-01-21Degree:MasterType:Thesis
Country:ChinaCandidate:H T YuFull Text:PDF
GTID:2382330596458625Subject:Engineering
Abstract/Summary:PDF Full Text Request
Engineering construction project is generally under complicated construction conditions,it is the process of construction cycle is long,investment,high technical requirements,needs the external support conditions of extensive and open bad operation environment,because of the great uncertainties numerous and change,leading to the risk of often affect the normal progress of the project and completed smoothly.A large number of engineering practice has proved that if give due attention to these risks and scientific management,to KL project owner and construction units to bring a lot of risks and losses,therefore,risk management is related to the success or failure of the project is an important factor,in order to complete the project to achieve the project within the time limit,at the same time,effectively reduce the loss of the project owner and construction units,the risk management of the construction project is particularly necessary.Due to the needs of the construction practice,the risk of construction project risk management at home and abroad experts launched a lot of research from different angles the different conclusion and put forward a variety of project risk analysis and evaluation method,but due to the influence of different construction project construction technology received and restriction factors,different experts and scholars study the risk analysis and risk solutions is not a universal,its actual application effect is not ideal,but increased the difficulty of risk management,directly affects the construction progress,quality and cost control,indirect damage to the construction of the overall return on investment of the project.Risk management system is the western economy developed countries after years of practice inspection summary and established a relatively mature system.The system now has become an international engineering project construction in the interests of parties generally follow the management,modern construction project management are the project risk management as an important points and project management deal with project risks and potential crisis the main solution.Based on this situation,this article choose KL project construction stage as the research object,using model study,on the characteristics of KL project construction phase and risk,on the basis of the research method of combining quantitative and qualitative method,USES the analytic hierarchy process,based on the basic principle of risk identification and risk assessment,follow the found problems-analysis problem-to solve the problem-summary of thesis research ideas,the experiences and lessons from KL construction stage risk factors identification,risk analysis,risk response,risk monitoring,etc in KL project construction stage comprehensive analysis and research on the risk management issue.Commitment to KL risks existing in the engineering construction project put forward effective risk prevention measures,so as to effectively reduce the KL project risks,scientific construction,efficient completion of project construction of the ideal goal and achieve cost-effective good return on investment.Culture KL again to the importance of the construction phase of the project risk management,and the content of the full text is summarized.
Keywords/Search Tags:Building engineering, Construction phase, Risk management, Analytic hierarchy process
PDF Full Text Request
Related items