Font Size: a A A

Post-assessment Of LJ Navigation Survey Ship Construction Project

Posted on:2020-03-20Degree:MasterType:Thesis
Country:ChinaCandidate:O ZhangFull Text:PDF
GTID:2392330575488963Subject:Engineering Management
Abstract/Summary:PDF Full Text Request
Post-project evaluation is a kind of technical and economic activity that systematically and objectively analyzes and summarizes the purpose,execution process,benefits,effects and impacts of the project after the project has been completed and operated for a period of time.Through analysis and evaluation,help investors improve decision-making and management level,and provide reference for the construction of follow-up projects.At present,there are few post-assessment analysis for shipbuilding projects,and the evaluation methods used are still relatively simple.The indicators involved in post-ship evaluation are difficult to quantify.With the continuous development of the shipbuilding industry,the post-assessment of shipbuilding in the future should also keep pace with the times,improve the ship management level through post-evaluation,continuously reduce maintenance costs,and achieve higher economic and social benefits.This paper takes the LJ navigation survey ship construction project as the research object,and carries out post-assessment on the implementation,operation,economic benefit and social benefit of the project,and compares the difference between the expected target and actual implementation effect of the ship construction project.The reason provides a basis for the sustainable development of the project,and also provides reference and reference for the construction of China's navigational measurement ship,in order to achieve satisfactory results.Based on the characteristics of the industry,the status quo of research at home and abroad,and using the theories and methods of literature analysis,analytic hierarchy process and post-evaluation theory,the paper makes decisions and preparations for the construction project of LJ navigation survey ship based on the overview of the construction project of the navigation mark survey ship.Summarize and evaluate the implementation process,evaluate the operation of the project and technical and economic indicators,evaluate the financial and social benefits,and select indicators to evaluate the comprehensive benefits based on the analytic hierarchy process and fuzzy comprehensive evaluation.After the conclusion of the evaluation and suggestions,the research in this paper has certain practical significance for improving the post-evaluation level of the construction project of the navigation mark ship.
Keywords/Search Tags:LJ Navigation-survey-ship, Construction project, post-evaluation, analytic hierarchy process, fuzzy mathematics assessment
PDF Full Text Request
Related items