Research On Cost Management Of Rotten Tail Project Based On BIM Technology

Posted on:2020-05-19Degree:MasterType:Thesis
Country:ChinaCandidate:C ZhangFull Text:PDF
GTID:2392330590454853Subject:Project management
Abstract/Summary:PDF Full Text Request
At present,China’s rapid economic development,the real estate industry has entered the rapid development,accompanied by a number of projects are rotting and will soon rot.Engineering differs from general commodities in that it involves a large amount of capital and a large number of resources.The first is the serious waste of national resources,and the second is the loss of interests of relevant creditors.The most terrible thing is that many homeowners are homeless because of the ruined housing construction.The existence of rotten tail project not only wastes a lot of resources,but also has a negative impact on the overall image of the city.In our country,we mainly adopt the whole process cost management model.Researchers mostly take the construction project as the research object in the exploration of cost management.Relatively speaking,the cost management of uncompleted tailings project is less explored,and the causes and Countermeasures of the deviation of focus to uncompleted tailings project are studied.Exploration and Discussion on the management of uncompleted tail project cost plays a key role in the whole project implementation process.It is conducive to the further reduction of project cost and the scientificalization and rationalization of enterprise profits.In this paper,in the practice of exploring the cost management of the rotten tail project,from the point of view of the whole life cycle,the PDCC management scheme of the bad tail project cost based on BIM technology is constructed,which is respectively from the planning stage,the design stage and the construction stage.The completion stage provides an optional scheme for the cost management goal of the rotten tail project,and is different from the conventional project.Taking the bad tail project in a city of Shandong Province as an example,through the application of the cost PDCC management scheme of the bad tail project,the cost management of each stage of the project has been effectively improved and the cost has been saved.The cost PDCC of bad tail project based on BIM technology is constructed.Evaluation of the benefit of the management scheme.Through questionnaire and fuzzycomprehensive evaluation analysis,the conclusion that the effect is good is obtained,which is consistent with the facts and is worth popularizing.It plays a positive role in the cost management problems existing in the current market,so that the management system and system of the cost of the rotten tail project can be further improved,so as to promote the development of the construction project in the direction of excellent specialty.
Keywords/Search Tags:Uncompleted works, Project cost, Management scheme, BIM
PDF Full Text Request
Related items