Research On BOO Project Bidding Evaluation Index System

Posted on:2019-02-12Degree:MasterType:Thesis
Country:ChinaCandidate:W ChenFull Text:PDF
GTID:2392330596465515Subject:Civil engineering
Abstract/Summary:PDF Full Text Request
The PPP model,as a new financing model that effectively solves the shortage of funding for the construction of China's and local governments,occupies an important position in China's economic development strategy,and plays a significant role in promoting domestic economic growth,improving the level of public services,and accelerating infrastructure construction.The BOO model as a new financing model under the PPP model has recently been widely used by the government.Bidding is an important part of the preparatory phase of BOO project initiation.Whether or not the bid evaluation is scientifically related to the smooth implementation of the project is relevant.However,the present situation of BOO projects in China is not satisfactory.The contradiction between the two methods arises from the legal basis for the procurement of government projects,and the evaluation index system of traditional construction projects does not apply to BOO projects,resulting in a BOO project.In the process of bid evaluation,various problems such as asymmetric information and unreasonable returns occurred,resulting in the eventual failure of the project.Therefore,it is of great significance to study the BOO project bidding evaluation index system.Based on the current situation and related basic theory research at home and abroad,this article analyzes the characteristics of BOO projects and the differences between general government procurement and the bid evaluation process,and summarizes the current state of BOO projects in China and the bidding and bidding activities.The existing problems were analyzed from the legal basis,procurement method and procurement process of the BOO project procurement,and discussed the existing information asymmetry,unreasonable returns,too short franchise period and poor social capital operation capacity in the existing BOO project bidding process.The problem provides a theoretical and realistic background for the construction of the BOO project tender evaluation indicator system.The literature research method and questionnaire survey method were used to screen and construct the indicators for evaluating social capital in the bidding process of BOO projects.Among them,the first-level indicators mainly include the bidder's financing capacity,construction capacity,operating capacity,bid price,and social factor indicators.Selecting more effective secondary indicators from them and establishing the BOO project bid evaluation index system.A qualitative and quantitative assessment approach was adopted to determine the index system evaluation model based on the AHP method and fuzzy comprehensive evaluation method.Taking the example of a medium and small business incubator center project in City A as an example,the evaluation model was used to evaluate the four pre-qualified bid units,and the overall score ranking of the bidding program was obtained to verify the rationality of the index system and the applicability of the model,and provide reference for the future BOO project bidding work.
Keywords/Search Tags:BOO, Bidding, Analytic hierarchy process, Fuzzy comprehensive evaluation method
PDF Full Text Request
Related items