Font Size: a A A

Study On The Cost Control Of The Owner Of China's Diplomatic Embassy In XX

Posted on:2021-02-04Degree:MasterType:Thesis
Country:ChinaCandidate:R X ZhaoFull Text:PDF
GTID:2392330614470997Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,China's foreign library construction development,its management pressure is growing foreign embassy on behalf of the external image of the country,also bear the unique work and task,because of foreign library project in the process of implementation are influenced by the political and economic laws and regulations of host and the natural environment,and many other factors,the cost of construction project management difficulty is greater,the traditional management method is difficult to competent for the management of such projects,therefore,on the owner party for each stage of the overall project design and construction procurement and effective dynamic control,to scientific and comprehensive cost control problems Project cost control is the project many common goal,but they are in the process of construction project priority is different,this article is based on the owner side Angle discusses the purpose of what happened in different stages of the design procurement construction cost control key if the owner party depends only on the construction contractor or third party professional project management unit to control the total project cost,often can not meet the expected demand,it can bring unnecessary cost to the owner side control risk.From the perspective of the client,this paper analyzes the background of the project of Chinese diplomatic missions in XX.Firstly,it discusses the matters that the client should pay attention to in the project cost control and Suggestions for improvement.Secondly,it analyzes and summarizes the common problems existing in the cost control of the owner in each stage of the construction project,and puts forward the targeted rectification measures and Suggestions.Again with the owner should know the master at all stages of the project from the Angle of side aspects are summarized in the end,combined with himself to participate in China's diplomatic missions in XX library project,based on their cost control problems in the practical work,apply the method of cost control to the project process,effectively solve problems and improve the cost control,also proves the practicability of method at the same time,therefore,for owner side to do in the future similar project cost control provides a successful experience.
Keywords/Search Tags:The owner party, Cost control, Construction of diplomatic missions and residences, Earned value analysis
PDF Full Text Request
Related items