Font Size: a A A

Research On Project Management Mode Of Hangzhou Ji Hong Lu Engineering

Posted on:2019-05-13Degree:MasterType:Thesis
Country:ChinaCandidate:L K YuanFull Text:PDF
GTID:2429330563990273Subject:Transportation engineering
Abstract/Summary:PDF Full Text Request
In 2014,the author was honored to participate in the construction of jihonglu,hangzhou.At that time,ji honglu project was the first batch of government investment in hangzhou to implement the management of agent construction system,and I was also the first practical contact agent management mode.Compared with previous government investment projects,there are great differences.In other words,there are more problems than previous projects,and the actual operation effect is not ideal.Thus,cause the project management mode of thinking of acting system,hope to find agent after in-depth research still exists the problem of incomplete,and work out a solution.First of all,it analyzes the domestic government investment projects,and demonstrates that the management mode of agent construction project is worth pursuing in the current government investment projects.Then through project instance problem column items,and then analyzes the factors of agent system,the operation of the project agent management model established the game model,according to the model list as the government of the principal and the principal of the relationship between the construction unit,explains part of the reason why there are the source of the problem itself acting system.According to the operation process of some surface acting system summarizes several problems of the management mode of acting system,including the awkward status of the construction unit,acting system and regulations is not sound,insufficient construction unit itself,the agent market disorder,and agent management supporting system lack of problem.In addition,the problems of agent construction system are analyzed in depth,and the obstacles to solve the problem are solved.Such as the reasons for the difficulty of legislating legislation,the resistance of traditional thinking and ideas,the problem of rent-seeking and the lack of supervision.After the project and the deep-seated reasons,the paper puts forward the direction of solving the problems from the perspective of government and the market and society.From the legislation,the system to the implementation of the supervision unit,the application of the market mechanism,the strengthening of the management and other aspects of the existing problems of the system to solve the solution.Through research,this article have analysis to its problems when Ji Hong Road project clear,find the solution to the problem,and puts forward some Suggestions of the perfection of a more comprehensive agent,hope to provide reference for the later generation system project.
Keywords/Search Tags:the agent system, the construction unit, the system construction, the supervision mechanism, the supporting system
PDF Full Text Request
Related items