| Aerospace industry is the important strategic industry in our country,bearing the army the sacred mission of rich countries,is a national science and technology strength and the embodiment of the comprehensive national strength,along with our country economy and the rapid development of science and technology,to promote the rapid development of the aerospace industry,so the user in addition to product performance and reliability index put forward higher request,to the project requirements also more and more short delivery cycle.In recent years,along with manned spaceflight,lunar exploration project,the beidou navigation space batch production project developing,such as space model has been developed from single or small batch production gradually transition to the batch production stage,but over the years,the vast majority of aerospace enterprises use the single small batch production mode of management,have the space characteristics of dense,in batch production of the project schedule management is still deficiency.Therefore,how to improve the level of research plan management,in combination with the practical situation of project design first and second network schedule,milestones,identify the critical path,the clear mission critical,to complete the project delivery batch production tasks on schedule,with good quality,not only is related to space five yuan xian branch(formerly 504)the reputation and interests,and other aerospace enterprise group in China in the production of project management is of general significance and promotion value.This paper in aerospace batch production project development project characteristics and the development course,on the basis of expansion of space batch production project schedule management contents of research.Detailed introduces the first batch of production of project schedule management related theory,which provides theoretical reference for subsequent research and thinking.Secondly,in view of the xi ’an branch(formerly 504)analyzed the current development schedule management,points out the main defects existing in the progress management method and does not adapt with the characteristics of batch production project development;Third,the network planning technique in aerospace batch production the practical application in project schedule management;Fourth,using the above method combined with the batch production project,I have to batch production project schedule control and optimization,and put forward the implementation measures,and verify the effectiveness of the control method,ensure the space enterprise batch production project completed on schedule.Through space batch production of the success of the project schedule management practice,prove network planning technique is suitable for the space of batch production project schedule management,can meet the requirements of aerospace project progress management,promote the institute project management level of ascension. |