Font Size: a A A

Research On Post Evaluation Of China Coal Group Tuke Project

Posted on:2019-08-31Degree:MasterType:Thesis
Country:ChinaCandidate:Y Y JiangFull Text:PDF
GTID:2439330572467082Subject:Project management
Abstract/Summary:PDF Full Text Request
The domestic economic system gradually become sound and perfect with the continuous progress of society after joining the WTO,China's world trade continues to develop,the investment environment is constantly improving,the application of post-evaluation in the domestic project management investment and evaluation areas More and more attention,more companies began to pay attention to post-evaluation in the application of project management.This paper studies the significance of post-evaluation of the project.Starting from the basic characteristics of the project,the development form of the project post-evaluation at home and abroad is studied,and the main contents and evaluation methods of the post-evaluation of the project are discussed.The basic test data of the project are analyzed,combined with the actual parameters,the problems encountered in the post-evaluation of the project are analyzed,and the causal relationship and the internal relations exist in the various stages of the project are discussed.The project management The paper analyzes the fuzzy comprehensive evaluation model of project post-evaluation,analyzes the factors influencing the impact of project post-evaluation on project management,the impact on economic development and the impact on social development.In this paper,combining theory and practice,this paper summarizes the role of post-project evaluation in subproject management,and determines the relevant indicators of project post-evaluation,especially the project social benefits,Economic efficiency and project management form,based on the strategic thinking of sustainable development,for the specific project,the provisions of the different characteristics of the project after the evaluation index.The results of the study can provide management reference for similar projects.As the characteristics of the project is divergent,the theory applied to the specific engineering practice,the project management index system should be based on the actual situation of the project to make some adjustments.
Keywords/Search Tags:Project management, post evaluation, chemical engineering
PDF Full Text Request
Related items