Research On Bidding Management Of Urban Rail Transit Civil Engineering

Posted on:2020-11-23Degree:MasterType:Thesis
Country:ChinaCandidate:L WangFull Text:PDF
GTID:2439330596963829Subject:Project management
Abstract/Summary:PDF Full Text Request
The technical characteristics of the urban rail transit civil engineering project determine that the construction process is an extremely complicated and arduous task.How to use the standard bidding management system to select a suitable contractor,so as to realize the bidding and bidding "good quality and low price" and " The goal of legal and reasonable,thus achieving the smooth management and control of urban rail transit civil engineering,is a problem that the current construction unit is very concerned about.From the perspective of the urban rail transit engineering construction side,combined with the current status of urban rail transit civil engineering bidding,after summarizing the relevant theories of civil engineering bidding management,the paper uses the literature data method and case analysis method to construct the urban rail transit civil engineering in China.The bidding management was researched,and the three aspects of bidder qualification,bid evaluation method and bid evaluation index were explained and explained.At the same time,taking the civil engineering project of Line A of Rail Transit A as an example,through the analysis of the selection mode of the key content of the case,the practical exploration and reflection on how to carry out the bidding management of urban rail transit civil engineering is carried out.The paper points out that in the process of urban rail transit civil engineering bidding management,it is necessary to fully consider the characteristics of the bidding project and the status of the potential bidding market,and reflect the principle of fairness and merit.The bidding qualifications should be wide-ranging and strict,and avoid restrictions;the bid evaluation method should be tailored to local conditions and avoid across the board;the bid evaluation indicators should be based on reality,highlighting the overall and key points.The research conclusions of this paper can provide reference for the bidding management of large-scale civil engineering projects,and also have certain enlightenment for promoting the development of urban rail transit bidding management.
Keywords/Search Tags:Status of bidding, Bidder qualification, Bid evaluation method, fairness and merit
PDF Full Text Request
Related items