| Power grid project is related to the lifeblood of national economy and national energy security.The power supervision company undertakes the process guarantee and consulting service of power grid project in the aspects of safety,quality,schedule and cost.Electric power supervision companies need to focus on thinking and studying how to use modern management mode to manage the enterprise,so as to better serve the construction of State Grid and create value for the company.Information management based on cloud platform is an efficient and intensive construction mode,which can solve the problems faced by companies in the process of realizing information management,such as decentralized management,low efficiency,information island,compatibility and poor scalability.With the help of cloud platform,the electric power supervision company can also realize remote supervision and intelligent control,which greatly promotes the overall improvement of the company’s management level and management quality.Taking A Electric Power Investment Group Co.,Ltd.Supervision Branch as the research object,this paper analyzes the current information management situation of A company by referring to the research ideas of Nolan six stage model and other ten information models,finds out the problems existing in the current information management of the company,and then uses Daniel’s success factor method to identify the key factors of the company’s information management,and analyzes the information requirements of the relationship factors Based on the analysis,the information management solution based on cloud platform is proposed.After clarifying the overall and specific objectives of the scheme,the following four scheme design ideas are proposed in combination with the formulation principles of the scheme: completing the company’s information organization reform,constructing the cloud platform information management framework,optimizing and integrating the existing information management system and equipment,and implementing the cloud platform information management knowledge training.Then from the management,technology and other dimensions of the feasibility analysis of the program,the feasibility of the conclusion.Then,from the perspective of the implementation process and guarantee of the plan,it is proposed to prepare from the three aspects of "people","finance" and "material",and to synchronize the implementation according to the four contents of the plan from the starting point of the ideological promotion and implementation throughout the company,and to put forward four guarantee measures: organizational guarantee,institutional guarantee,security guarantee and financial guarantee. |