| In recent years,as a pillar industry in China,the construction industry has also exposed many shortcomings after rapid development,and the progress management and control of engineering still face great challenges.Therefore,the synchronous improvement of enterprise management and technology level is of great historical significance for improving the development level of China’s market economy and the core competitiveness of the company.In the actual construction process of the project,not only to meet the requirements of the project quality objectives,but also to solve the relationship between the progress of the work and the project related resources,so that this paper can reasonably prevent and manage the project management risk,the impact of the project to minimize the impact of uncertainty.Achieve the quality objectives of the project,progress indicators,reduce the cost level of the project,and then realize the purpose of improving the overall benefit of the project.In this paper,the Happy Home project as the study object,combined with the project duration requirements and construction difficulties,the construction phase of the main influencing factors are carefully analyzed,at the same time using the network work schedule plan and network optimization methods to develop and optimize the project schedule objectives.And put forward the schedule control methods and measures for the key problems and deviations found in the implementation process to ensure that the schedule target is completed on schedule.Through the research and analysis of project schedule management,this paper has auxiliary and guiding significance for project management team to carry out actual project control.The mature schedule management theory system also plays a more important role in project management.Progress management should also be constantly optimized and innovated.This paper uses effective project management tools to ensure the realization of progress objectives.At the end of the paper,the paper summarizes the conclusions related to the progress management of the Happy home project and prospects the application of the dead enterprise.Through the progress control of engineering projects,improve the ability to make project plans and improve the level of project progress control.The operation method applies the similar project development in the future to reduce the development cost of the enterprise and ensure the quality delivery. |