Font Size: a A A

A Study On The Traffic Jam Problem And Countermeasure In West Exit Of GuiYang

Posted on:2009-05-10Degree:MasterType:Thesis
Country:ChinaCandidate:Z J HeFull Text:PDF
GTID:2132360242492668Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
With the development of the economic and the urbanization process, the traffic jam of city exit gets more worse, which makes the people's life and work inconvenient, what's more, influences the city function and clogs the social economy. In addition to this, traffic jam can cause lower speed, wasting time, wasting fuel, increasing pollution, increasing accident and people's bad condition.There is also a traffic jam problem of city exit in GuiYang . From the traffic status and the traffic problem of the main road, we can find that the traffic problem of west Guiyang results from the geography condition and history, because of that the traffic of west Guiyang is lack of base establishment and can't satisfy the growing demand of people.From the current traffic status and problems of west Guiyang, the reason of the traffic problems are analyzed. With the various field understanding and the linear regression, the population and volume are forecasted. To get help from the forecasted figure, we can conclude that solve the traffic jam is needed very much. Four-step traffic demand forecast model is used to analyze the traffic generation and transit trip. So measures of making corrections are put forward to plan the west Guiyang traffic development reasonable.Utilizing the example of resolve of the traffic problem at home and abroad and linking with the development of the economic, the article proposes the method to relive the traffic jam. The measure and the train of thought of the key problem are also put forward to help the development plan of the west Guiyang.
Keywords/Search Tags:municipal traffic, traffic jam, traffic survey, Four-step traffic demand forecast model, traffic forecast
PDF Full Text Request
Related items