With the social development and people's living standards improvement, Large halls Gallery Stadium, hangars and other large buildings are needed during people'social activities and production. And the most competitive structure to solve building large structures is the space structure. A grid space structure as the hyper-static structure has undergone many accidents. In fact, the construction management of grid structure also plays a most important part in the development of high quality grid structure.Based on the search of gird structure construction projects organizing management, the field construction technology management, quality management and several other aspects, the article has a solution of grid Construction projects setting up steps, identifying bodies and functions, identifying personnel and responsibilities. Expound several common used field organizing ways of gird structure construction projects. Raise a point of establishing scientific construction program during the gird construction is the key point, setting up a corresponding management system is needed and the importance of construction project manager during the field management. Comprehensive quality management is an enterprise-wide, the entire process, whole staffs'management. With taking a case as an example, it presents the comprehensive quality management in grid construction applications, summed up the experience during the project processing, with a view to serve for the similar design and construction.This article discussed a project example, summarized construction experience and experimental data of a gird shell project in HENAN province. Confirmed the quality factor ponderance by using AHP technique, and discussed the application of the model through one example. |