Font Size: a A A

The Research On KPI Performance Administrative System In Nanjindu Power Sation

Posted on:2006-01-14Degree:MasterType:Thesis
Country:ChinaCandidate:J YangFull Text:PDF
GTID:2166360155462011Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Since 21st century, How to improve enterprise key competitiveness and company achievement in an all-round way have already become into an important subject for more and more domestic and international enterprises.With the maturity of the market and the aggravation of competition, the traditional electric system is facing the severe challenge day by day. Recombinant and reform system and implement reasonable company administration structure is the developing stage when electric enterprises of China must be gone among the process of reform. The disappearance of strategy and the lacking of carrying strength is bottlenecks restraining the electric enterprise's performance from managing development. In order to survive better and tackle the competition pressure brought in electric marketization, electric enterprises must rely on a set of science and effective management system to support the enterprises' operation. This text attempts to take nanjindu power station of Hunan Province as an example. It is a management system of the central performance to study KPI from the angle based on strategy, expecting to break through and innovate to some extent in this respect?The theoretical foundation in this thesis is the theory method system of performance management, mainly including: key performance index management system, balance scorecard management system and bench marking management system. This text is guide with the basic theories of KPI performance management of foreign countries and the application study of domestic KPI performance management. According to these theory, combine our country's local electric reality of enterprise, deeply analyzing Hunan nanjindu power station's current performance situation, and using the balance score card theory to find out the key factor of success that the strategic objective of Nanjindu power station can be realized, form KPI goal frame of enterprises; and then, using the matrix decomposition chart of goal to do better correlation analysis, matching the tactic goal with the functional department the power station, utilizing causality picture is it Forming department magnitudes of KPI to resolve; Then draws out the KPI of the staff post by department KPI. In implementation of KPI performance administrative system, this text explains the content of each link that should pay close attention in performance manage circulation, put forward the concrete solution to the question which have predicted to be appearing.This thesis studies the KPI, taking strategy as direction, performance management...
Keywords/Search Tags:Nanjindu Power Station, Performance Management, KPI
PDF Full Text Request
Related items