Font Size: a A A

Construction Project Management On Nianfengyazu Build Residential Area

Posted on:2012-02-22Degree:MasterType:Thesis
Country:ChinaCandidate:J LiuFull Text:PDF
GTID:2189330332498280Subject:Project management
Abstract/Summary:PDF Full Text Request
JinXin real estate development Co., LTD in Panjin, the construction of residential district, built in TianGuZhen merchant project, the residential development and construction of the pace of urbanization TianGuZhen help boost the local crowds, improve the living level, beautification life environment.In this paper, built in abundance, construction planning and project construction management, according to the actual needs of project management of construction plan, organization and management, quality management, production safety management weak links and key quality control points of jacket on empirical research, put forward rational solutions and countermeasures, so as to improve project management level, and improve the quality and construction enterprise economic benefits.Paper, according to the reference WBS recently theory division, subdivisional work requirement, clear project WBS recently decomposition of each type of construction range. Through the analysis of the main construction process, labor arrangement, mechanical equipment equipment, construction schedule, etc, and the specific requirements for engineering construction well prepared in advance.Establish a well-defined power, command, running efficient mater construction project management organization is the successful guarantee. The paper built in abundance and design of construction project management process, clear the setups of each project post responsibility, emphasizing construction team management and project general contracting coordinated management.Built in abundance in construction project management, quality, insist the management strategy, the standard construction, scientific management, ensure the engineering quality one-time acceptance and reach national qualified engineering standards. Through constructing project quality assurance system, strengthen the control of schedule, strengthening production and construction materials, strengthening the control of quality control, execute three-level clarification system, insist on example guide system, strengthen the product protection and the corresponding quality control standard and measures of performance, achieve its quality goals.Built in abundant project construction, the construction process, should further from cost plan and cost control step of strengthening cost management. Project cost of implementation of the target responsibility system, joint according to each item construction and each cost factors will cost control goal to carry out the relevant responsible persons decomposition. Projects accounting is project cost control, to establish the main means to the project manager for the centre project cost assessment team, implement the project ZuoYeDui inside the post and the completion of cost management target of evaluation. Project cost control throughout the whole process of project construction, to implement, item by item, progressive business risk and dissolve section of accounting risk.Build projects, in abundance in construction process, insist on the principle of safety first and prevention safety production policy, improve the safe production guarantee system, take effective safety measures. Cadastre employees civilized construction and environmental protection consciousness raise establish a sound corporate image.
Keywords/Search Tags:project management, quality management, cost management, security management
PDF Full Text Request
Related items